Concept preview · not a live product
Sample site built on Mason Nest. Copperline Roofing is a fictional company; reviews, prices and details are illustrative.
⚡ Hail reported in Mandarin & San Jose last night. Free storm-damage inspections this week. Book an inspection →

Roof leaking? Storm damage? Know your price in 60 seconds.

Family-run roofing for Northeast Florida. Replacements, repairs and storm restoration, with straight answers before anyone climbs a ladder.

4.9 on Google (sample) Licensed & insured Same-week inspections 10-year workmanship warranty

Instant roof estimate

Step 1 of 2

Enter your address. We measure your roof from aerial imagery.

Roof type you want
Licensed state roofing contractor (sample) Insured general liability & workers' comp 10-year workmanship warranty Manufacturer warranties registered for you

What we do

Every job starts with a free inspection and a written, line-item quote. No pressure, no surprise charges.

Roof replacement

Shingle, metal and tile, with manufacturer-backed material warranties and full cleanup the same day.

Most homes done in 1–2 days

Repairs & leaks

Missing shingles, failed flashing, soft spots, ceiling stains. Most repairs are done in a single visit.

Same-week scheduling

Storm restoration

Hail and wind damage documented with photos and a written report you can share with your insurer.

Free storm inspections

Our work

Drag the slider to compare before and after. Every finished job is photographed and added here automatically.

Before After
Mandarin · architectural shingle · 2,300 sq ftTear-off to install: 1 day
Atlantic BeachStanding-seam metal · 1,850 sq ft · 2 days
San MarcoLeak repair + flashing · 1 visit
OrtegaHail damage, full replacement

How a roof replacement works

No mystery, no surprises. Here's exactly what happens after you book.

Free inspection

We walk the roof, photograph everything, and check the attic for hidden leaks.

This week

Line-item quote

A written quote with every material and charge itemized. Compare it with anyone's.

Within 24 hours

Install day

Tear-off, new underlayment, new roof. Your yard is tarped and protected the whole time.

Most homes in 1–2 days

Cleanup & warranty

Magnetic nail sweep, final walkthrough, and your warranties registered in your name.

Same day

A new roof without the shock

Spread the cost into monthly payments. Checking your rate is a soft credit pull that won't affect your score.

Start with your estimate
Estimated monthly payment
$170
Example at 8.99% APR. Illustrative, not an offer of credit.

What neighbors say

4.9
★★★★★
Sample rating · real sites sync reviews from Google
★★★★★

"They found hail damage two other companies missed and explained every photo."

Sample review · Mandarin
Owner reply: Thanks for trusting us with your roof!
★★★★★

"The online estimate was within a few hundred dollars of the final quote. No pressure at all."

Sample review · Riverside
★★★★☆

"Great crew and spotless cleanup. Scheduling took a week longer than I hoped."

Sample review · San Marco
Owner reply: Fair point, and thank you. We've added a second crew for the fall.

Roof tips

Answers to the questions homeowners actually search for.

Storms · 4 min read

How to tell if hail damaged your roof (without climbing up)

Materials · 6 min read

Metal vs. shingle in Florida heat: what actually lasts

Seasonal · 4 min read

Hurricane season prep: a 10-minute roof checklist

Common questions

Can't find yours? Text us. A real person answers.

How long does a roof replacement take?

Most homes are done in one to two days. Larger or steeper roofs, and tile, can take longer. Your quote includes the schedule.

Will you work with my insurance company?

If you ask us to, we'll share our photos and findings with your insurer. We don't interpret policies or handle claims: your insurer decides what's covered. Florida notice: the homeowner is responsible for payment of any insurance deductible, and it is insurance fraud for a contractor to pay, waive or rebate any part of a deductible.

Do I need to be home during the work?

Only for the start and the final walkthrough. We'll text you updates and photos as the job progresses.

What happens if it rains mid-job?

We watch the forecast closely and never leave a roof open overnight. If weather turns, the roof is dried-in with underlayment before anyone leaves.

What warranties do I get?

A manufacturer warranty on materials, registered in your name, plus our own 10-year workmanship warranty.